Home / Our work
Our remodeling work.
Before and after, on jobs we have finished. Same rooms, same light, nothing staged — because the honest version is the one worth showing.
Full kitchen refit
New cabinetry, countertops and a full repaint. Same footprint, a completely different room.
Walk-in shower rebuild
Old surround out, wet wall rebuilt and waterproofed, then tile walls, a pebble floor and a sliding glass door. East metro, early 2026.
Ceiling framed and finished
Metal furring and light boxes framed in, then board hung, taped and finished smooth, with the room sealed off in plastic.
Office repaint, after hours
Patched, sanded and repainted in a working office, done in the evening outside business hours. North metro, March 2026.
Tear-out and leveling, St. Paul
Old tile and adhesive out down to the subfloor, then brought flat with a leveling layer so the new floor sits level. March 2026.
Studio control room floor
New plank flooring through a recording studio’s control room. Install day on the left, handover on the right.
Basement bathroom
Vanity, fixtures and finishes into a room that had none of them worth keeping.
Living room repaint
Walls and ceiling taken from tired beige to a clean grey. Trim and window surrounds cut in by hand, no tape bleed.
Staircase re-carpeted
Stripped back, re-treaded and carpeted, with the nosings finished properly.
Hardwood brought back
Sanded to bare timber and resealed rather than torn out. Cheaper, and the boards were worth saving.
Bedroom repaint
A dark accent wall taken back to a clean neutral, ceiling and trim included.
Striped feature wall
Every line laser-set and cut by hand. No tape bleed, no wandering edges.
Exterior stairs rebuilt
Rail and treads rebuilt, then painted and sealed against the winter.
Front steps recoated
Handrail repaired, treads recoated, edges cut clean where the paint meets the concrete.
Where it starts
A ceiling stain that has been quietly spreading. By the time it shows, the water has already been somewhere else first.
The dry-out
Flood cut back to sound material, air movers aimed at the framing, dehumidifier pulling gallons a day until the readings say stop.
Contained and moving
Sheeting across the doorway so the rest of the house stays out of it, and the walls opened far enough to dry properly.
Nothing photographed in that category yet — ask and we will send recent examples.
Want yours in here?
Tell us the room and what is wrong with it. We will come and look, and put the price in writing.